|
This last picture shows the motors that will provide the power for The Beast, they are 24v dc, 80 watt motors from electric scooters so should have ample grunt for the job!!
The next phase is the carrying
wheels and the drive tracks and I will sent pictures as I solve the
problems involved (hopefully!!!!!) |
|
Here are the latest pictures of THE BEAST, I have just made all the 120 track plates and have started to assemble the tracks. Each plate is made from two sections of birch ply accuratly overlapped and then drilled for the mounting holes. This has meant 240 4mm holes drilled within 0.1 mm of calculated position to avoid locking up the drive chains as the tracks go around the drive sprockets. Each of the two drive sprockets is made from a pair of 32 tooth bicycle pedal chain rings ( only the best used shimano sprockets for me, obtained from a local cycle dealer for free!) bolted onto a birch ply hub. Every other tooth has been ground off to clear the M4 bolt heads as the track goes around the sprocket. The original idea to use the hinge strip as I did on the carriage had to be abandoned as the pitch of the drive chain did not match up to the joints of the hinge strip. ![]() ![]() ![]()
The rubber track pads will
be glued on to the outside of the track at a later stage. More pictures
will be posted in due course.
|
|
Next to add all the
walkways and the winch at the rear of the model. |