Afternoon All
Cabin upholstery added, made it very light replacing the supplied ply with a balsa core and as I'll be keeping the 'door' open, it'll look the part. (Well if anyone has a torch...):


Then its more of the lime planks:

Have to be a bit creative with clamps and elastic bands to get a good close fit at the deck edge:

And this is current state of build:

And I'm down to scraps of lime planks, not quite enough to complete, which is not ideal. I thought I'd just used one plank to make brackets and so on that aren't in the instructions. If I hadn't I'd be fine. Seems Amati don't leave much leeway.
Anyway, ordered some more for stock from CMB, plus some spare 1x1mm lime that Andy found was also down to the wire on the deck inlay. Also added some extra Mahogany strips just in case, they're not expensive.
As the modified dash is has LEDs and resistors behind it I've modified the deck lime planks to be slightly shorter, only about 8mm. It'll be covered with supplied mahogany parts later in the build.
Here's the dash dry fitted:

Power connector seen at lower right of the dash (above) has a matching connector built into the cabin roof so will be hidden. Power cables are also in place for the dock lights and mast lights.

That's about it for now. Hoping the additional wood will be here in a couple of days. I'll trim up whats done so far but not start sanding til deck is complete.
Best regards to all.
David.