Thanks for the responses
Geoff....no, the initial fill will be manually via the boiler top port, subsequent filling or topping up is planned via the steam drive [main] or auxiliary [electric] driven pump
JerryC....I think I had misunderstood the concept you use.......
...from your latest posting it is similar to the model steam train engine boiler feed/ bypass system....may I ask the bore & stroke of the
ooyah/2 [George] ...designed & built pump?Keith.... I have a fellow member Southstyne2 a few kilometres from me.........he has designed & built a fully functioning boiler level water control level system & I have witnessed that it works perfectly
In fairness, I must learn to walk before I can run...so will wait until the primary & auxiliary pumps are running under manual control.........Derek