No progress on the hull as it's too cold and damp in my shed, so, it lives in the spare bedroom at the moment awaiting Spring.
Meanwhile, working on the seats and electronics.
The photo is of the Helmsman and the double Passenger seats, just roughed out and ready for a couple of coats of Dope to aid final sanding as I have used Balsa.
Will finish the rear seat and the rest of the items that need upholstering later.
The Photo shows the electronics that will be fitted.
The 2 small Blue PCB's are step up voltage controllers, they increase a small 7.2 volt LiPo battery to 14volts for the 3 cooling fans.
The 2 small Green PCB's are variable voltage controllers which are set to drive the 2 docking lights and dashboard LED's.
The larger Green PCB with the probe attached is a temperature monitor to be fitted in the motor,battery compartment. It has an adjustable alarm point which can trigger a free relay allowing me to fit an audible or visible external device, maybe a very high visibility LED or some sort of sounder, or both.
The other larger Blue PCB just for setup purposes for the other modules, will be mounted in a hand held box to make it portable.
The final photo shows all of the interior upholstered parts which I hope to reproduce, the only difference will be the piping colour, I intend to use Red in place of the Blue.