Oh well, I Y joined all the motors together and I will give her a pond test soon.
I worked on the torpedo launchers. The cupolas are turned from Modlab with the gear train made from a strip of plank effect styrene card.

The tubes were detailed and fitted to the cupolas before the training mechanisms were added using styrene rod, strip and some wire for the handles.

I have the Launch bottles and breech detail to add before I can claim these done.

The launcher with the shallow cupola sits on the mini superstructure (possibly called the Fidley, though wether this means for the whole length I do not know) forward of the searchlight bandstand.
The bridge received more attention with storage (?) boxes being added to the sides and rear. These were made from Modlab and detailed with styrene strip.

The bridge searchlight was also fitted to its pintle. Has anyone gta an idea of what the mechanism looked like the controlled the light? It had a system of rods and linkages leading from the light down to the bridge deck where it was controlled. I have plans etc but they are way too small for more than just hints.

The searchlight is from J.R. haynes.