Hi
I know less about electrics than I do about modeling and I only started modeling 5 weeks ago.
I'm about to get my electrics up and running :-\
My boat is the Marie Felling Single Screw.
Am I right with this :-
1. 2 x BATTERIES. From POS to POS and NEG to NEG. Connecting both BATTERIES. (12v sealed lead)
2. Two wires to ESC, (ACTion P93) from the BATTERY with a fuse board in line, (ACTion P91) on POS wire.
3. Two wires to ESC, from Motor.
4. Wire from ESC. (fitted) Connected to connector from RECIEVER.
5. RECIVER Socket - 'battery slot', connected to i) BATTERY. (supplied) ii) ESC - with ON / OFF switch in line, connected to ESC.
5. Servos connected as needed.
I've read through the posts on electrics, all seem to be of relevance and well structured, but not what I can digest, with my very limited knowledge
I guess I'm a little paranoid
Reading through the numerous posts showing what you guys have achieved is truly fantastic and makes me want to ask more and more questions, in more detail that the last.
regards
Gary :)
PS Do I need BEC? (whatever it means)