Hi everyone,
This morning I took a little trip to the local harbour at Caleta de Velez, which is about 60 kilometers east of Malaga. I spotted work being done on this large fishing boat and decided to watch them for a while. They were finishing off the red lead below the waterline and then they lifted her from the blocks, moved her some 200 meters to the water and lowered her in. The boat reversed away before heading out to open water.
The whole thing took less than 40 minutes. I was very impressed and had a great time down there. Hope you all like the photos...
Barry