Posted: Sat Jan 16, 2010 9:24 pm • Post subject:
Hi All
Well I managed to get back into the workshop after a nearly 3 day break. A word of warning - NEVER leave your workshop for more than 8 hours if your short term memory is faulty! I couldn't find a thing on my return so had to TIDY (Euch!) and start again.
I managed to get the centre section deck planked with the waterways attached. The whole thing will lift off complete with funnels, paddle boxes and flying bridge deck, The reason for this is that there is so much in the way of rigging and stays in this area. If I don't make the whole thing removable then I will end up spending about an hour rigging each time I want to get inside the model.
I have mounted the engine room skylight on its base and put the funnel bases and funnels in position in preparation for building the centre deck assembly. I just slipped the paddle boxes into position to give me an idea of heights etc. I'm just a little disappointed with the joint in the deck. I was forced to place it where it is in full view, and unfortunately the planks appear to have been cut from 2 separate batches. There's only a few thou difference in their widths - but over that size deck it means that they don't all line up - ah well, measure Twice, cut Once as they say
More later.
All the best
Stuart