Issue 43 & 44 consisted of the external rail elements to the shelter deck, each rail had a total of 34 brass etched parts to assemble, and some of them were quite small (will have to find my magnifying glass).
The instructions started by gluing the 4 main rail elements together, then adding the brackets, but the uprights fitted into a slot in the internal rail which would make it difficult to fit if I followed the instructions.
I first glued all the brackets to the internal rail, and then after sanding the mating sidesof the rails, they were finally glued together, this made the rail quite ridged.
The holes for the eye bolts were redrilled before they were glued to the outside face of the rails, these were the smallest parts to be fitted being about 2mm in size
The final job was to glue seven discs over the portholes on the inner wall of the shelter deck.
Part of the external wall was also included, but I have left this off until the upper deck pieces are ready to fit, the deck handrails are included on the etch and may get damaged if fitted now.
Regards
Peter