Just watched a documentary on the building of the first. 38 weeks start to finsh!
37 weeks ? ABSOLUTE NONSENSE
the directors not showing all the graft to construct the sections (blocks) dont forget these will be outfitted ready to go in to join the next block . . . you dont do that in 5 minutes . . . it'd been more believable if they'd said ASSEMBLED in 37 weeks. . . & if that gentleman had spoken to me the same way he did to the Korean guys over delays
we would've been having words . . . .
Did you see the camera shots of the longditudinal corridor in rough weather ? that ship must have been twisting 1 - 2 metres over the length of the ship in bad weather & these are bigger still . . . .
Bill (in & around shipbuilding for 40 years
)