I was off work today ........ 'er indoors was at work, so no bitchin' on about noise and stuff. I decided to get a bit done. So, we have....
1. Deck planking lines / caulking finished.
2. Forward superstructure / Hatch cover......... The wheelhouse get's added after the wheelhouse deck and bulkhead are planked with some 0.6 x 6mm African Walnut.
3 Aft Superstructure / Hatch cover.
4. Hatch Cover (Shaft UJ Coupling Access) ....... This is a small box like thing that appears pretty much useless.
.......... The three hatch cover / Superstructures are still rough and will need some filling and sanding .......... But they all fit. Big relief.