The hull planking continues . . . . . .
I added two wider (1/4 inch) strips to the lower part of the frames. The first one sat nicely into the 'rabbit', but both took a little care where they sit into the rebate running up the bow. As the slope/rake of the bow is extremely gentle, care is really needed all the way up. Where any strips meet either this rebate or 'run off' at the stern I have thinned the timber down, just a fraction of a millimetre, hoping to get more glue adhesion. (PVA)
I'm running the planks just past the stern and trimming off when dry with my fine saw. I'll finish later with a sanding block and then add the rudder stock.
around 24 (total) planking runs to go . . . perhaps a big balsa sheet and lots of filler . . . . . .
As as for sanding . . . cor blimey gov' . . . there's now more wood on the floor (and everywhere else) than what arrived in the box