finally for today, I put onto the two end walls, the guids for the side walls to fit into, which will be seen to work later. they were made from 5mm ply, bevelled one edge to take the wall.
then support lip for the removable floor was glued in to the underside of the structures access hole.
finally the side floors were thickened by a second layer of 3,5mm ply, which is what the main floor is made from, so that the side walls have ample gluing surface to attach to..............all using waterproof aliphatic resin quick grab glue and plenty of clamps.