Also made a start on the railings.[/size]I made up a simple jig/template for the flying bridge railings – much easier getting the 3 rails to bend into the same radius this way.The other railings took a bit longer than anticipated but I don't mind the whole soldering/filing process so it was a quite relaxing couple of evenings.I've slowly been adding to the box of bits to go onto the boat. There is a completed boat in there somewhere. Only the lights (12), flying bridge console, life buoy brackets (4) and speakers (2) left to make – yahoo!From today there should be more coming out than going in.Started placing the various components in place. First the deck equipment, then the fenders, then starting on the superstructure. As usual there is a order that things need to be done and as usual I find that I either haven't made something or need to remake/repaint something and the whole process stops for awhile.Everything is waiting on the glazing at the moment, which is waiting on a paint touch-up.