Half an update, if any of you have missed other posts, I have been without my laser cutter and my laptop for quite a few weeks now, which has rendered modelling to almost nil.
I'll just post the photo's of what I have got done in the meantime, I found I had trouble lifting the work deck for access with it being dropped into the hull as it is. After pondering on best options, I decided on some deck furniture/clutter to help out. All of the items shown are glued to the deck with the exception of the most forward of the containers, these have been glued and screwed from the underside. This means I can grab a hold of these and pull the entire deck out easily.
All the containers have been cast in resin then painted and decals added, the skips were built from plasticard, and the drill pipe is brass tubing. I will need to 'dirty' this deck clutter up,but that is for a later date.
Not sure whether these have been on before, but I finished the life raft pods, the side rails and the railing around the rear of the deck above the winch house.
Nothing more to add at this point, the next update I'll be back with a motor drive update, some more on the wheelhouse and of course the remaining deck cranes.