So I started with the electrical instalation so a new servo piece of plywood was made and extended to cover the motor so I could mount all of the gear out of harms way
The first to be placed on the mounitng board was the Esc....all the electronics being used are ACTion
I decided not to use the ACTion distribution board and use a car blade type fuse box to feed everything but to use an ACTion bec obviousy to feed the esc and reciever......The components placed on the board are a P98 High power esc,an ACion 93 Multy controller a ACTion Amplifier and a P100 Noisy thing
An illuminated rocker switch was also installed ...this will control a 40 amp car relay which when switched on will allow power to be fed to the fuse box etc
Pic of where the relay....all the power cables have been encased in some proper electrical sheathing and had the ends heat shrunk...............all the auxillary wireing will be encased in this as well,should keep Mr Milbourn Happy
Having run out of cable I decided to do i job Ive been putting off for months ....the bullwarks...unfortunately every single one is different so I cant mass produce then ARGHHHHH...so I needed to assertain the correct angle of the deck to the side....nothing I have would do this so I had to make on...a very simple tool....2 pieces of brass bar with a nut and bolt through it ............nothing beats simplicity in my mind.
Proof of the pudding 2 bullwark supports made....simply using some lite ply and some thin planks glued on edge to the support
Between some of the support these vents will be simply glued to the sides of the hull
Dave