Looks like my build is sympathising with you Stan, whilst installing the magnets for the flybridge I noticed that the plastic control arms at the top of the rudder tubes have split where they bolt on to the rudder posts. The ones I used are actually from the Riva motorising kit so that’ll be another Amati component in the bin. I’ll either buy or fashion new new ones from aluminium, at least I noticed before the boat failed on a pond.
I should be able to post pictures of the cabin and flybridge wiring layout tomorrow with magnets installed.