Mission Control, we (may) have a problem...
The mahogany planking appeared at deck level leaving a small gap which I've filled. I'm not sure whether this means my profiling of the lime layer was incorrect as it met the deck.
Outcome is I've started to sand a flat where deck meets hull:[/size]But have stopped before going too far. My plan is to use the 3.5mm chrome edging (ebay) so I'll wait for that to arrive to see how it fits... Also to fit the mahogany deck side panels (parts 214 / 217) then sand to their shape.
There's another related issue, the bow now has a different side elevation to the plans where it joins the deck:
My plan is to sand back on the deck edge and then the line of the bow to bring it back to plans, to keep the upward curve...
Any comments from my Aquarama colleagues are welcome...
In the meantime, in an effort to stay out of further trouble, I'm building the slipway:
Regards to all
David.