With our RAN FFG's, just as their US designers plan, the service changeout of an GE2500 LM gas turbine was a planned time based event
Being a 48-hour? event, planned changeouts were achieved during limited outages during a normal Service Period
[a planned outage is an event when a vessel is not expected to be able to present for duty]
[this was an intentional design aspect so not to have two major mechanical events occurring in close proximity]
I had the priviladge of supervising the first planned [12 day] removal and changeout of the 76mm Otto Gunmount [during a Docking]
So I knew the turbine was lifted out in a box on rails, but obviously was not interested from which hatch
Despite the
DANGER signs, I was more than a little concerned that the
Dockyard workers didn't walk over the 15ft diameter domed wooden + canvas disk covering the hole in the deck and letting rain water into the magazine spacesSo where are these hatches on the AB Destroyers?Derek