Did anyone check the width of the bridge ahead I know they checked the height
just an aside comment, why do they build things that big, where they then have to transport it through tight spaces and up winding roads, can they not design and build it, test it, take it apart in sections and then transport it, its like Eurobus planes, they transport sections through the french countryside through winding roads and tight villages to the assemble it in a plane factory with a runway, why didn't they build the factory and runway closer to a port to allow for easier transport, or build a bigger plane than the russian AN225 to transport lots of bits - beggers belief