So my first piece of handrail is in place and painted. I have the deck supervisor in the photo for scale example at this point. They are a pain to paint, the stanchions and bottom two rails being dark green and then the top rail being white, keeping the green of the grey deck and the white of the green stanchions is quite a laborious task.
I have also redone, the safety first warning decal, I wasn't happy with how it applied the first time. Also on the aft deck surface. first time around I couldn't get the dangerous cargo decals to stick to the rough surface even though it had several clear coats on it already. So I sprayed 3 more coats onto the timber, rubbed it back with 1500 grit wet/dry paper then two more clear coats. The decals have now stuck and have been sealed in place with more clearcoat. There is a mistake with these in my haste to print them off I only realised when applying them that I had spelled Dangerous Cargo when it should be Dangerous Goods- ah well, its staying now!
Jobs for next time, I am making up some bulkhead storage boxes for firehose, breathing apparatus etc. I am re-doing the access ladder to the crane, thats why the paintwork on it looks rough at the moment, also the bulkeads adjacent to it need to have final coat paint added and the deck to wall join neatening up. More railings and the handrails on the companionways to make up. Then on to the twin drum waterfall winch for the winch house.
I have made the decision to complete this part of the build before moving on to the intricate superstructure so that is still a week or two away at the moment. That's all for now.