Thank you gentlemen for your support
so here we go again.
Finished the painting, how I ever got the water line to be straight I will never now, I was lucky, that was the trickiest thing I've done so far.

Now it's time to start on the boiler, first we have to cut the holes in the mud tubes, I've done this with a 5/16 slot drill on the mill, this way the hole will be vertical
and round!.

Then I had to build a jig to hold the down tubes .


Now the big moment using B&Q copper brazing rods at £3.48 for 4.

Looks a bit messy but they all do just after brazing, off to the chemist know for some citric acid to clean them up
then it's make another jig to hold both of these and braze the them into the top 2" tube.
I'll post again when I've done it.
This is a message to the Moderator - would it be possible to change my name back to Kerrsy and reinstate my full mayhemer as I was before the crash
could you also tell me how I can contact you without messing up this thread?
thank you